|
|

Location
Sand Creek Channel, CA
Agency
Perini Building Company
Project Value
$1,902,781
Project Description
Reyes Construction will install a 20’ x 20’ high concrete box culvert at the South Crossing. The scope of work includes the demolition and disposal of the existing South Crossing structure; rail and wire revetment; unusable rock and boulders; unsuitable backfill soil; any grout and cement within the channel; and any existing fencing. Reyes Construction will also clear and grub, provide shoring, pre-mold joint fillers, gates, etc., as well as provide erosion control, channel water diversion and pumping. 24” RCP piping and connections were installed in 10 locations to include building tie-ins. Additionally, the existing bridge was removed.
Click Here to view another project.
|
View More Photos
Rollover a photo to view it.
Channels, Dams & Basins
Click on another project below:
San Manuel Casino Box Culvert & Storm Drainage
Santa Paula Creek Improvements Reach 3
San Juan & Trabuco Creek Channel Repairs
Lower Santa Ana River Flood Control Channel Improvements
Haines Canyon Debris Basin Cleanout
San Luis River Basin Flood Control
San Gabriel River/San Jose Creek Channel Improvements
Modjeska Canyon Repairs
|