San Manuel Casino Box Culvert & Storm Drainage

Location
Sand Creek Channel, CA

Agency
Perini Building Company

Project Value
$1,902,781

Project Description
Reyes Construction will install a 20’ x 20’ high concrete box culvert at the South Crossing.  The scope of work includes the demolition and disposal of the existing South Crossing structure; rail and wire revetment; unusable rock and boulders; unsuitable backfill soil; any grout and cement within the channel; and any existing fencing.  Reyes Construction will also clear and grub, provide shoring, pre-mold joint fillers, gates, etc., as well as provide erosion control, channel water diversion and pumping.  24” RCP piping and connections were installed in 10 locations to include building tie-ins.  Additionally, the existing bridge was removed.

Click Here
to view another project.
View More Photos
Rollover a photo to view it.

Channels, Dams & Basins
Click on another project below:

San Manuel Casino Box Culvert & Storm Drainage
Santa Paula Creek Improvements Reach 3
San Juan & Trabuco Creek Channel Repairs
Lower Santa Ana River Flood Control Channel Improvements
Haines Canyon Debris Basin Cleanout
San Luis River Basin Flood Control
San Gabriel River/San Jose Creek Channel Improvements
Modjeska Canyon Repairs