Location
San Juan Capistrano, CA
Agency
County of Orange, Integrated Waste Management Division
Project Value
$885,748
Project Description
Reyes Construction constructed 8,000 SF Household Hazardous Waste Collection pre-engineered building. The project scope included: the design, fabrication and installation of a fire sprinkler system and fire alarm system; fire and domestic water supply system, piping and connections; backflow preventers, hose-bibs and eye wash stations; a landfill gas collection system, HDPE liner system under the building slab; electrical improvements; excavation and grading; asphalt paving (new and restoration of existing); miscellaneous concrete improvements; surveying; and as-built drawings. This project was successfully completed 2 months ahead of schedule.
Click Here to view another project.
|
View More Photos
Rollover a photo to view it.
Landfills
Click on another project below:
Frank R. Bowerman Landfill
Santiago Canyon Landfill
Gothard Street Landfill
Prima Deshecha Landfill
California Street Landfill
Twenty-Nine Palms Landfill
|