Channel Islands Dredge Support 2005

Location
Channel Islands, CA

Agency
U.S. Army Corps of Engineers (Client)/Manson Construction (Prime)

Project Value
$554,214

Project Description
Manson Construction Co. was required to remove (via hydraulic dredge) approximately 300,000 CY of sand from the entrance channel of Channel Islands Harbor and place the sand on the beach.  Because of prevailing ocean current in the Channel Islands Harbor area, sand drifted into the entrance channel.  The current and waves also erode sand from the beach in front of houses near the harbor.  The purpose of this project was to maintain a sufficient depth in the navigation channel into Channel Islands Harbor, and also to restore an adequate strip beach in front of the houses south of the harbor.  Reyes Construction, Inc. provided all of the land based labor and equipment for installing discharge pipe on the beach to transport sand from the entrance of the harbor south of the pier.  Reyes Construction, Inc. also performed fill placement operations 24-hours per day and 6 - 7 days per week.

Click Here to view another project.
View More Photos
Rollover a photo to view it.

Marine, Waterfront & Port Projects
Click on another project below:

Pier 400 Site Improvements
Mission Bay Boat Launching Facilities
USCG Misc. Facility Improvements
Pier 400 Los Angeles Channel Deepening
Repair of Pier 4 San Diego Naval Base
Ventura Breakwater Groin Repair
MCRD Marina Boat Dock Expansion
Maintenance Dredge Support Oceanside
Maintenance Dredge Support Channel Islands