|
|

Location San Francisco, CA
Agency U.S. Navy, Southwest Division NAVFACENGCOM
Project Value $560,000
Project Description Reyes Construction was awarded this design-build contract which consisted of providing engineering evaluation, design and construction of an above ground new live pump station to bypass the existing below ground live pump station. The work included furnishing, installing and testing pumps, controls, appurtenances and providing temporary pumps and piping. In addition, the project included fresh water system service connection alterations, providing and installing new fire hydrants, 8” and 12” water mains along the existing roads, as well as providing disinfection and pressure testing services to all water lines. Other tasks included: paint/corrosion coating to exposed structures, incidental work, supports, associated piping work, demolition, asphalt concrete pavement, traffic control and water diversion.
Click Here to view another project.
|
View More Photos
Rollover a photo to view it.
Design-Build
Click on another project below:
Fresh Water Distribution Systems @ HPNS
Sewer System Upgrades Phases 1 & 2, NAF El Centro
Repair/Upgrade Water Distribution System & Treatment Plant, El Centro
|