Location Point Mugu, Ventura County, CA
Agency U.S. Navy, Southwest Division NAVFACENGCOM
Project Value $7,975,000.00
Project Description Reyes Construction, Inc. was awarded this design-build contract which consisted of providing engineering evaluation, design and construction for the repair of the waterline distribution system basewide at Naval Air Station, Point Mugu, CA. The scope of work consisted of traffic control, dewatering, excavation, trenching, backfill, mainline pipe installation, lateral and appurtenance installation, cathodic protection, hydrostatic testing, waterline tie-ins, abandonment of existing waterlines, and paving at 18 different locations basewide. Additional work included jack and boring, runway restoration, shoring and pits, landscaping, hardscape restoration, as well as miscellaneous site improvements and incidental work. All total, 40,000 LF of pipe was installed at Point Mugu.
Click Here to view another project.
|
View More Photos
Rollover a photo to view it.
Design-Build
Click on another project below:
Fresh Water Distribution Systems @ HPNS
Sewer System Upgrades Phases 1 & 2, NAF El Centro
Repair/Upgrade Water Distribution System & Treatment Plant, El Centro
|