Location Rosemead, CA
Agency City of Rosemead
Contract Value $10,897,555.00
Project Description This project consists of the on-site replacement of the Garvey Avenue Bridge over the Rio Hondo Channel in the City of Rosemead, CA. The work includes the removal of the existing bridge consisting of five (5) piers, abutments, and uperstructure, as well as the removal and reconstruction of the existing pavement approaching the bridge, curb and gutter, driveways, sidewalks, construction of slough wall, ornamental fence and columns, street lighting, signing and striping. The new bridge has four (4) spans with a total length of 420 feet and total width of 100 feet. The exterior spans are 93 feet long, and the exterior spans are 117 feet long. The superstructure consists of 52 pre-cast, pre-stressed bulb-tee girders spliced at pier supports and cast-in-place concrete deck. Both pier walls and seat-type abutments are supported by pre-cast concrete driven piles.
Click Here to view another project.
|
View More Photos
Rollover a photo to view it.
Structures & Bridges
Click on another project below:
Chevron Bridge Modification
Rio Hondo River Bridge Demolition
Oakcrest Golf Course Retaining Wall
U.S./Mexico Border Concrete Bollard Fence
Piru Creek Bridge Widening
Union Pacific Railroad Sound Wall Improvements
|