Magic Mountain Parkway Bridge

Location
Santa Clarita, CA

Agency
City of Santa Clarita

Project Value
$3,100,000

Project Description
Reyes Construction, Inc. build a new box-girder bridge 800 feet in length and 100 feet in width.  RCI poured 2,300 CY of concrete for Soffit/Stem pour within an 8-hour period. The scope of work included: concrete piling; water/river diversion; rip rap; slope paving; barrier rail; installation of a 36-inch high-pressure gas main; reinforced concrete abutments; paving and striping.