|
|

Location City of Corona, CA
Agency Stronghold Engineering, Inc. (Prime) / U.S. Army Corps of Engineers
Project Value $773,000
Project Description Reyes Construction, Inc. worked as a subcontractor to Stronghold Engineering, Inc. to provide utility relocation at the Prado Dam. Our scope of work included: removing and replacing 200 LF of 42-inch RCP pipe and installing new rubber expansion joints and flap valves; removing 160 LF of 12-inch PVC and replacing it with new Ductile Iron Pipe inside a 20-inch casing and installing two (2) new connectors; removing 200 LF existing 18-inch VCP sewer pipe and placing new 18-inch HDPE pipe and sealing manholes; and removing 1,200 LF of existing 12-inch steel water pipe and constructing new 12-inch Ductile Iron Pipe.
Click Here to view another project.
|
View More Photos
Rollover a photo to view it.
Pipeline, Water/Sewer, Utilities
Click on another project below:
CSUDH Mainline Extension
Replace Insulation & Jacket HTHW Lines @ 29 Palms
San Joaquin Reservoir conversation to Reclaim Water Project
Oil/Water Wash Separators, Camp Pendleton
Fresh Water Distribution Systems @ HPNS
Sewer System Upgrades Phases 1 & 2, NAF El Centro
Repair/Upgrade Water Distribution System & Treatment Plant, El Centro
Madrona Lateral Recycled Water Pipeline Extension
|