Design-Build
- Design/Build Repair of Navigational Aids & Lighting to Runways 3-21 & 9-27
- South Gate Commercial Vehicle Inspection Entry Facility
- Sewer Main Repairs Between 2nd and Ocotillo Streets
- Water Distribution System, Point Mugu
- Storm Erosion Repairs
- Child Care Development Center Site Improvements
- Fresh Water Distribution Systems @ HPNSSan Francisco, CA
- Sewer System Upgrades Phases 1 & 2, NAF El Centro
- Water Distribution System & Treatment Plant
- Special Missions Training Branch (SMTB) Battle Course, MCB Camp Pendleton, CA
Pipeline, Water/Sewer, Utilities
- C-17 Road Work & Utilities Upgrades (FY 08)
- Repair Non-Potable Water Mains
- C-17 Road Work & Utility Upgrades (FY 07)
- Repair Upgrade Wastewater Treatment Plant
- Prado Dam Utility Relocation - Phase II
- Sewer Upgrade Phase IV
- Repair CMA Pump Station BLDG 2241
- San Manuel Piping & Road Work, Indian Svc. Rd.
- Repair Sewer Mains Between 2nd & Ocotillo
- Repair Waste Water Treatment Plans
- Waterline Distribution System
- Madrona Lateral Recycled Water Pipeline Extension
- Sewer System Upgrades Phases 1 & 2
- Fresh Water Distribution Systems @ HPNS
- Oil/Water Wash Separators
- San Joaquin Reservoir Conversion to Reclaim Water Project
- Replace Insulation & Jacket HTHW Lines
- CSUDH Mainline Extension
Marine, Waterfront & Port Projects
- Taney Pier Repairs
- Sector San Francisco Shoreline Stabilization
- Navigational Aids & Lighting (Utility Pier)
- Former Navy Pier Rehabilitation
- Storm Erosion Repair
- Maintenance Dredge Support, Channel Island, CA
- Maintenance Dredge Support, Oceanside, CA
- Ventura Breakwater Groin Repair
- MCRD Marina Boat Dock Expansion
- Repair of Pier 4 San Diego Naval Base
- Port of Los Angeles Channel Deepening
- USCG Misc. Facility Improvements, Ballast Point
- Mission Bay Boat Launching Facilities
- Pier 400 Site Improvements (L.A. Harbor)
- Sausalito Yacht Harbor Bulkhead Replacement
Channels, Dams & Basins
- Repair of Levee and Concrete Flood Wall Joints
- Santa Clarita/San Francisquito Creek Trail Repair
- San Luis River Basin Flood Control
- San Gabriel River/San Jose Creek Channel Improvements
- Modjeska Canyon Repairs
- Santa Paula Creek Emergency Streambank Protection
- San Juan & Trabuco Creek Channel Repairs
- Lower Santa Ana River Flood Control Channel Improvements
- Haines Canyon Debris Basin Clean Out
- Santa Paula Creek Improvements Reach 3
- San Manuel Casino Box Culvert & Storm Drainage
Landfills
- Toland Landfill Biosolids & Microturbine Site Improvements
- 29 Palms Sanitary Final Landfill Closure
- CA Street East Side Landfill Closure Improvements
- Prima Deshecha Landfill Hazardous Collection Center
- Santiago Canyon Landfill Closure
- Gothard Street Landfill Closure Improvements
- Frank R. Bowerman Landfill Emergency Landslide
Facilities & Buildings
Asphalt/Concrete, Paving & Roadways
- Airfield Striping Removal & Concrete Repairs
- Various Paving Repairs @ NWSSB
- Repair Parking Lots, Various Locations
- Re-Pave Parking Lot, BLDG 1456
- Morongo Bingo & Casino Road Improvements
- Reconstruct A/C Paving, BEQ's (TP-0113M)
- Repair to El Prado Crossing & Sandia Creek Drive Roadway & Embankment
- Repair Ordnance Access Road
- Child Care Development Center Site Improvements
- MCRD Roadway & Street Improvements
- Camp Wilson Road Construction
- Kimball Ave Freeway Undercross
- Fairway Drive Construction
- Paving Projects @ NWSSB
- Arthur MacArthur Road Construction
- Buchanan Street, Wells Street & B-57 Courtyard
- Mercury Drive Paving Repairs, LA AFB
- C-17 Road Work & Utility Upgrades (FY 07)
- C-17 Road Work & Utilities Upgrades (FY 08)
- Repave Parking Lots
- Palm Avenue Street End Improvements
Structures & Bridges
- Chevron Bridge Modification
- Rio Hondo River Bridge Demolition
- Oakcrest Golf Course Retaining Wall
- U.S./Mexico Border Concrete Bollard Fence
- Union Pacific Railroad Sound Wall Improvements
- Piru Creek Bridge Widening
- Magic Mountain Parkway Bridge Construction
- Bridge Modifications @ Atlantic Ave. & Artesia Fwy.
- Garvey Ave. Bridge Reconstruction over Rio Hondo Channel
- Park Blvd. @ Harbor Dr Pedestrian Bridge
- Seismic Retrofit & Painting of First Ave. Bridge Over Maple Ave.
- Bolsa Chica Pedestrian Bridge
