C-17 Road Work & Utilities Upgrades (FY 08)

  • C-17 Road Work & Utilities Upgrades (FY 08)

    • Location: Travis AFB, Fairfield, CA
    • Agency: U.S. Navy
    • Project Value: $2,281,310.00

    Project Description

    Reyes Construction, Inc. removed and replaced 47,000 SF of roadway along Ellis Drive and Ragsdale Road. An additional 47,000 SF of roadway was rehabilitated with a 6in. overlay placed on the lower portion of the existing roadway. Work included sawcutting, removal of existing asphalt concrete, recycling of asphalt concrete, excavation and grading, furnishing and placing crushed aggregate base, placement of asphalt concrete pavement, constructing concrete curbs and gutters, constructing concrete sidewalks and cross-gutters, installing geotextile material and rock for drainage, electrical underground transmission and distribution, exterior lighting, new street lighting, utility relocating, striping, shoulders, a pump station, French drainaged system, culverts, fire hydrants, and traffic control.