Child Care Development Center Site Improvements

  • Child Care Development Center Site Improvements

    • Location: Camp Pendleton, CA
    • Agency: U.S. Navy
    • Project Value: $615,000.00

    Project Description

    Reyes Construction, Inc. worked in conjunction with lead engineering firm, Willdan, to provide design/build imporvements to Child Development Center (CDC) Area at Camp Pendleton. We provided leveled and compacted site preparation construction around and adjacent to the CDC to include: excavation and grading, utilities (water, sewer and storm drain), hazardous and unsuitable material removal, storm water pollution prevention, drainage, concrete, electrical and communications construction.