Santa Clarita/San Francisquito Creek Trail Repair

    Santa Clarita/San Francisquito Creek Trail Repair

    • Location: Santa Clarita Trail Repairs along the Santa Clarita River and San Francisquito Creek, Ventura County, CA
    • Agency: City of Santa Clarita
    • Project Value: $1,474,149.00

    Project Description

    Reyes Construction repaired two (2) pedestrian trails, the South River Trail alongside portions of the Santa Clarita River and the North Valencia II Trail along the San Francisquito Creek, that had been washed out by the storms in January 2005. The scope of work included grading, fence repair, fence replacement and drainage improvements. Other tasks included: dewatering, open excavation trenching (up to 22 feet), installing rock below the existing creek channel, slope protection and rebuilding bike paths.