Sewer System Upgrades Phases 1 & 2, NAF El Centro
-
Sewer System Upgrades Phases 1 & 2, NAF El Centro
- Location: NAF El Centro, CA
- Agency: U.S. Navy, Southwest Division NAVFACENGCOM
- Project Value: $4,989,702.00
Project Description
Reyes Construction was awarded this design-build construction project in order to construct a new sewer conveyance system, force mains and repair the existing distribution system.