Pier E North Gate, POLB

    Pier E North Gate, POLB

    • Location: Long Beach, CA
    • Agency: Port of Long Beach
    • Project Value: $24,041,730.00

    Project Description

    The Work required by this Contract included but was not necessarily limited to:  Demolition of existing improvements; including recycling of existing asphalt, concrete, cement treated base and crushed miscellaneous base, mass grading of the site, demolition of existing utilizes, asbestos pipe abatement, construction of a new storm drain, sewer and water utility infrastructure, installation of cement treated base, class 2 base, asphalt paving and PCC paving,  design and construction of two sheet pile shoring systems (35’ and 45’ deep) which facilitated the construction of two sewer lift stations, installation of new electrical and communication systems, Installation of High Mast Lightpole area lighting, striping, signage, construction of two (2) pre-engineered metal OCR Buildings complete with sprinkler and fire alarm protection systems, installation of fencing and K-rail, gate arms, traffic signals, traffic loops, miscellaneous concrete pedestals and other concrete structures, construction of twelve (12) truck scales, installation of Radiation Portal Monitors (RPM) and a Customs and Border Protection booth.