Port of Los Angeles Channel Deepening

    Port of Los Angeles Channel Deepening

    • Location: Port of Los Angeles, San Pedro, CA
    • Agency: U.S. Army Corps of Engineers for the Port of Los Angeles
    • Project Value: $30,785,704.00

    Project Description

    Reyes Construction Inc.'s work involved the removal of approximately 2.5 million cubic yards of surcharge material from Pier 400 which was loaded onto barges for offshore disposal; removal and replacement of 800,000 cubic yards of unsuitable material to an elevation of 10ft. below final grade (approx. +4 MLLW); removal of approximately 750,000 cubic yards of surcharge material from Pier 300, loaded to barges for disposal at a submerged storage site; furnish and install 18in. storm drain system and furnish and install 108in. storm drain system; construction of berm at the Anchorage Road Dredge Material Disposal Site to increase unsuitable dredge material storage capacity; placement of approximately 300,000 tons of 3in. minus gravel drainage blanket at Berth 100; placement of approximately 150,000 tons of crushed aggregate base @ Pier 300. Reyes Construction, Inc.'s scope also included the Cabrillo Beach Sand Replacement.