Sausalito Yacht Harbor Bulkhead Replacement

    Sausalito Yacht Harbor Bulkhead Replacement

    • Location: Sausalito, CA
    • Agency: City of Sausalito
    • Project Value: $4,647,349.71

    Project Description

    This project replaced a 50 year old timber bulkhead with a concrete sheet pile wall located in an active boatyard. The scope of work included a test pile program, install guide piles, install floats, removal and replacement of approximately 800 ft of boardwalk with handrail, replacement of a damage travel lift crane slab, furnishing and installing 800 feet of concrete sheet pile (individual sheet pile was 4 ft. wide, 14 inches thick and varied in length from 39 ft. to 60 ft.), install tie back system to new bulkhead wall, replacement of electrical service, storm drain system, water and fire service. The concrete sheet piles were cast off-site (Kie Con Inc.) and were transported to the job where they were installed using a vibratory hammer with a Manitowoc 4000w crane.   For placement control / spotting of the sheetpiles, RCI utilized a project specific built pile template (structural steel).