Madrona Lateral Recycled Water Pipeline Extension

    Madrona Lateral Recycled Water Pipeline Extension

    • Location: Torrance, CA
    • Agency: U.S. Army Corps of Engineers
    • Project Value: $10,407,467.00

    Project Description

    Reyes Construction provided all operations necessary for the construction of a recycled 15,000 LF of water transmission main consisting of 24 CML steel pipe and 12, 8, 6 and 4 C-900 PVC pipe including tie-in connection to an existing, below grade 30 ductile iron pipeline, fittings, valves, air/vacuum valve assemblies, blow-off assemblies, cathodic protection assemblies and test stations, a jack and boring operation, restoration, traffic control and testing of pipeline facilities. Other tasks included: insulation kits and appurtenances and gaskets; exploratory excavation for utility conflicts; removal and/or protection of existing utilities and improvements; temporary or permanent support of utilities; construction staking; bedding, slurry, backfill and compaction; gate and butterfly valves and valve boxes and covers; temporary bulkhead for testing welding; shoring and bracing of trench. Work also required the removal and replacement of PCC pavement and aggregate base course to match existing condition. This included saw-cutting, grinding and/or pulverizing in-place.