Prado Dam Utility Relocation - Phase II

    Prado Dam Utility Relocation - Phase II

    • Location: City of Corona, CA
    • Agency: Stronghold Engineering, Inc. (Prime) / U.S. Army Corps of Engineers
    • Project Value: $773,000.00

    Project Description

    Reyes Construction, Inc. worked as a subcontractor to Stronghold Engineering, Inc. to provide utility relocation at the Prado Dam. Our scope of work included: removing and replacing 200 LF of 42-inch RCP pipe and installing new rubber expansion joints and flap valves; removing 160 LF of 12-inch PVC and replacing it with new Ductile Iron Pipe inside a 20-inch casing and installing two (2) new connectors; removing 200 LF existing 18-inch VCP sewer pipe and placing new 18-inch HDPE pipe and sealing manholes; and removing 1,200 LF of existing 12-inch steel water pipe and constructing new 12-inch Ductile Iron Pipe