Firestone Blvd. Bridge Widening over LA River, South Gate, CA

    Firestone Blvd. Bridge Widening over LA River, South Gate, CA

    • Location: South Gate, CA
    • Agency: City of South Gate
    • Project Value: $4,979,158.00

    Project Description

    The Project is located on Firestone Boulevard between Rayo Ave and the I-710 freeway, over the Los Angeles River.  The general items of work include the portion of the bridge removal, construction of a new bridge, construction of new roadway pavement and associated signing, striping, lighting, providing for staged construction, and providing storm water pollution prevention controls.