Garvey Ave. Bridge Reconstruction over Rio Hondo Channel

    Garvey Ave. Bridge Reconstruction over Rio Hondo Channel

    • Location: Rosemead, CA
    • Agency: City of Rosemead
    • Project Value: $10,897,555.00

    Project Description

    This project consists of the on-site replacement of the Garvey Avenue Bridge over the Rio Hondo Channel in the City of Rosemead, CA. The work includes the removal of the existing bridge consisting of five (5) piers, abutments, and uperstructure, as well as the removal and reconstruction of the existing pavement approaching the bridge, curb and gutter, driveways, sidewalks, construction of slough wall, ornamental fence and columns, street lighting, signing and striping. The new bridge has four (4) spans with a total length of 420 feet and total width of 100 feet. The exterior spans are 93 feet long, and the exterior spans are 117 feet long. The superstructure consists of 52 pre-cast, pre-stressed bulb-tee girders spliced at pier supports and cast-in-place concrete deck. Both pier walls and seat-type abutments are supported by pre-cast concrete driven piles.