Magic Mountain Parkway Bridge Construction

    Magic Mountain Parkway Bridge Construction

    • Location: Santa Clarita, CA
    • Agency: City of Santa Clarita
    • Project Value: $3,100,000.00

    Project Description

    Reyes Construction, Inc. build a new box-girder bridge 800 feet in length and 100 feet in width. RCI poured 2,300 CY of concrete for Soffit/Stem pour within an 8-hour period. The scope of work included: concrete piling; water/river diversion; rip rap; slope paving; barrier rail; installation of a 36-inch high-pressure gas main; reinforced concrete abutments; paving and striping.